by Breia Monti | Sep 23, 2022
This project involved the transformation of the old Surrey Memorial Hospital emergency department into a new, state-of-the-art 10 bed unit. The Child and Adolescent Psychiatric Stabilization Unit provides a therapeutic environment for children and adolescents...
by Breia Monti | Sep 23, 2022
The Central Saanich Fire Hall is a two-storey concrete, steel and wood frame structure built to post disaster standards. This facility was designed and built to achieve LEED Silver Certification (2015). The new 20,000 sq. ft fire station serves as the Fire...
by Breia Monti | Aug 10, 2022
The existing Nanaimo Regional General Hospital (NRGH) Thermal Energy Centre had reached the end of its operational life span. Kinetic was contracted to perform renovation work and new construction of the facility. The new thermal energy centre replaced the existing...
by Breia Monti | Aug 9, 2022
This project involves a major expansion of the UBC Bioenergy Research Demonstration Facility (BRDF) which involves the addition of a 12 megawatt (MW) hot water boiler capacity to the existing BRDF 6 MW steam plant, along with other major modifications and upgrades to...
by Breia Monti | Jul 23, 2022
Kinetic performed work for an addition and remodel to Blue Grouse Winery, one of the first bonded wineries on Vancouver Island, outside Duncan, BC. The project added one level and a mezzanine (6,228 sq ft) to the existing winery. To do so, Kinetic salvaged a portion...